Brent two bridges project

A project to replace two road bridges over the Dudding Hill line (or Dudding Hill loop) in the Brent area is anticipated to begin by the end of 2026.

This vital work is needed to provide enough clearance under the bridges for container freight from the strategic rail freight interchange being built at Radlett to use the line.

The two bridges planned to be renewed between end of 2026 and 2028 are:

  • Bridges CAW 09 located on Craven Park in the London borough of Brent
  • CAW 10 located on Craven Park in the London borough of Brent

More information will be available soon as the programme develops.