Piling

Before work can begin on electrifying the railway, we need to complete a vast amount of design and preparation work.

Part of the preparatory work includes foundation installation, which we call piling. Piling is required to install foundations which will support Overhead Line Equipment (OLE). Once the piles have been installed, we will then begin to erect trackside posts and overhead wires. This work began in Wales in 2015.

Frequently Asked Questions

Would you like to know more about our piling work? 

Call us on 03457 11 41 41       Email us at CRWales@networkrail.co.uk     Tweet us at @NetworkRailWAL