Skip to content

Periodic review 2013 (PR13)

PR13 established our outputs and funding for Control Period 5 (CP5), and developed an incentives framework for the rail industry

CP5 is the period from 1 April 2014 to 31 March 2019.

This page includes a link to our access charges for CP5, and responses and conclusions for relevant consultations. It also includes our responses to ORR’s PR13 publications.

CP5 access charges documents

Closed consultations and conclusions

Full list of closed consultation documents and responses

ORR publications on PR13

Read the ORR publications on PR13

Network Rail responses

Read our responses to the ORR publications on PR13

Together we can end domestic abuse