Access For All - A-Z of station improvements

Access for All is a £370m upgrade programme improving accessibility by introducing lifts and ramps at train stations nationwide.

 

If your station is not listed and you'd like more information about accessibility there, please visit National Rail Enquiries.

×
A

Abergavenny

Installation of 2 lifts and a footbridge.

Future planned

2013/2014

Last Updated

27 April 2012

Acocks Green

2 new lifts and expansion of existing footbridge. New stairs.

Completed

2014/2015

Last Updated

30 July 2015

Aldershot

New footbridge and 2 lifts.

Completed

2013/2014

Last Updated

30 July 2015

Alexandra Palace

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Alfreton Parkway

A new footbridge with lifts and stairs.

Future planned

2016/2017

Last Updated

30 July 2015

Alnmouth

Installation of 2 lifts to the existing bridge plus significant additional station works including the removal of barrow crossing.

In progress

Winter 2012

Last Updated

7 November 2012

Alton

New footbridge and 2 lifts.

Completed

2013/2014

Last Updated

30 July 2015

Audley End

Footbridge and 2 lifts. Platform and overhead wires upgrades.

Completed

2009/2010

Last Updated

30 July 2015

B

Balham

Lift from subway to platform and associated platform works.

Completed

August 2008

Last Updated

30 July 2015

Barnes

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Barrhead

Single lifts and works to platform retaining wall.

Completed

November 2008

Last Updated

30 July 2015

Barrow-in-Furness

Installation of new lifts into subway and other station improvements.

Completed

2009/2010

Last Updated

30 July 2015

Barry Town

Study completed for step-free access at the station.

Future planned

2016/2017

Last Updated

30 July 2015

Battersea Park

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Bearsted

Add lifts to proposed renewed footbridge.

Completed

2014/2015

Last Updated

30 July 2015

Berkhamsted

Construct a new two span footbridge with three lifts to the west of the station buildings. Improve signage and way finding along the access route

In progress

2014/2015

Last Updated

30 July 2015

Bexley

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Bexleyheath

Add 2 lifts to renewed footbridge.

Completed

2014/2015

Last Updated

30 July 2015

Billericay

Installation of a lift

Completed

2014/2015

Last Updated

30 July 2015

Bingley

Two lifts added onto existing footbridge at the station.

Completed

2013/2014

Last Updated

30 July 2015

Birchwood

New footbridge with 2 lifts.

Completed

2015/2016

Last Updated

30 July 2015

Birkenhead North

Provision of two lifts and a bridge.

Completed

2013/2014

Last Updated

30 July 2015

Blackburn

Lift from subway to platform.

Completed

2011/2012

Last Updated

30 July 2015

Blackheath

One lift available for public use at the station.

Completed

2011/2012

Last Updated

30 July 2015

Blackhorse Road

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Blairhill

Option selection reports completed.

Future planned

2015/2016

Last Updated

30 July 2015

Boston

Works to and around a barrow crossing.

Completed

2011/2012

Last Updated

30 July 2015

Bracknell

Footbridge and 2 lifts, alterations to OHLE, platform works.

Completed

February 2009

Last Updated

30 July 2015

Brentwood

Three lifts to be built onto footbridge at station.

In progress

2014/2015

Last Updated

30 July 2015

Bridgend

Two lifts and new footbridge at the station.

Completed

2011/2012

Last Updated

30 July 2015

Brockenhurst

New footbridge and three lifts at the end of the platforms

Completed

2014/2015

Last Updated

30 July 2015

Brockley

One lift added to footbridge and tactile platforms at the station.

Completed

2014/2015

Last Updated

30 July 2015

Bromley South

Two lifts available for public use at the station.

 

Completed

2012/2013

Last Updated

30 July 2015

Brondesbury

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Burnham (Buckinghamshire)

One lift from subway to platform to be built at the station. Discussions with stakeholders currently ongoing.

In progress

2015/2016

Last Updated

30 July 2015

C

Camden Road

Two lifts at the station.

Completed

2012/2013

Last Updated

30 July 2015

Canterbury East

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Canterbury West

Two lifts and footbridge at the station.

Completed

2010/2011

Last Updated

30 July 2015

Carlisle

Two lifts built into subway at the station and the provision of a new mobile buggy.

Completed

2013/2014

Last Updated

30 July 2015

Carshalton

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Cathays

Provision of accessible route

Future planned

2016/2017

Last Updated

4 August 2015

Chadwell Heath

Three lifts and new footbridge at the station.

Completed

2012/2013

Last Updated

30 July 2015

Chatham

Provision of accessible route

Future planned

2017/2018

Last Updated

30 July 2015

Cheadle Hulme

Three lifts and footbridge

Completed

2011/2012

Last Updated

30 July 2015

Cheltenham Spa

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Chippenham

Two lifts and public right of way bridge at the station.

In progress

2014/2015

Last Updated

30 July 2015

Chirk

New ramped footbridge

Completed

2014/2015

Last Updated

30 July 2015

Clapham Junction

Nine lifts to all platforms and links to platforms 11/12 and 15/16.

Completed

2011/2012

Last Updated

30 July 2015

Clapham Junction (Grant Road)

Lift for public use at the Grant Road end of the station.

Completed

2012/2013

Last Updated

30 July 2015

Coulsdon South

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Crawley

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Crewe

Provision of one lift from the car park

Completed

2013/2014

Last Updated

30 July 2015

Crystal Palace

Lift to platform 1

Completed

2013/2014

Last Updated

30 July 2015

Cupar

One ramp at the station.

Completed

2010/2011

Last Updated

30 July 2015

D

Dalmuir

Three lifts and bridge to platforms.

Completed

2009/2010

Last Updated

30 July 2015

Denmark Hill

Three lifts to all platforms and a bridge.

 

Completed

2012/2013

Last Updated

30 July 2015

Dorking

Two lifts to platforms with a footbridge.

Completed

2011/2012

Last Updated

30 July 2015

Dunblane

Three lifts and a new footbridge.

Completed

2014/2015

Last Updated

30 July 2015

Dyce

Two lifts and a footbridge.

Completed

2013/2014

Last Updated

30 July 2015

E

Earlsfield

Two lifts from ground level to all platforms at the station.

Completed

2012/2013

Last Updated

30 July 2015

Easterhouse

Ramp available for public use at the station.

Completed

2010/2011

Last Updated

30 July 2015

Edmonton Green

Station lifts

Completed

2014/2015

Last Updated

30 July 2015

Elgin

Provision of accessible route

Future planned

2015/2016

Last Updated

4 August 2015

Elstree & Borehamwood

Three lifts for public use at the station.

Completed

2014/2015

Last Updated

30 July 2015

Ewell East

Ramps to both platforms and adjustable ticket counter 

Completed

2013/2014

Last Updated

30 July 2015

Ewell West

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Exeter Central

Footbridge and two lifts from entrance to platform

Completed

March 2008

Last Updated

30 July 2015

F

Fareham

Footbridge and 2 lifts, associated platform works 

Completed

2009/2010

Last Updated

30 July 2015

Farnborough (Main)

Two lifts from entrance to platform and footbridge.

Completed

2011/2012

Last Updated

30 July 2015

Fazakerley

Two lifts added to footbridge providing step free route from entrance to platforms.

Completed

March 2009

Last Updated

30 July 2015

Finsbury Park

Lifts from underground areas of station.

In progress

2017/2018

Last Updated

30 July 2015

Fleet

Footbridge and two lifts to station platforms.

Completed

2013/2014

Last Updated

30 July 2015

Forest Hill

Footbridge and two lifts to platforms at station.

Completed

2009/2010

Last Updated

30 July 2015

Formby

Provision for two lifts

Completed

2014/2015

Last Updated

30 July 2015

Fratton

Footbridge and two lifts to platforms at the station.

Completed

2009/2010

Last Updated

30 July 2015

G

Garforth

Provision of accessible route

Future planned

2016/2017

Last Updated

4 August 2015

Gleneagles

Step-free access

Completed

2013/2014

Last Updated

30 July 2015

Gloucester

Footbridge and two lifts to platforms at the station.

Completed

2012/2013

Last Updated

30 July 2015

Godalming

Construct a new footbridge with two new lifts and infill of the existing underpass

Future planned

2019/2020

Last Updated

30 July 2015

Gospel Oak

Two lifts and raised ramps at the station.

Completed

2012/2013

Last Updated

30 July 2015

Gravesend

To build two lifts and footbridge at the station.

Completed

2013/2014

Last Updated

30 July 2015

Grays

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Grimsby Town

Footbridge and two lifts to platforms at the station.

Completed

2011/2012

Last Updated

30 July 2015

H

Hackbridge

Ramp to platform 2, adjustable ticket counter, automatic doors, new accessible toilet

Completed

2013/2014

Last Updated

30 July 2015

Hackney Central

Two lifts added to footbridge at the station.

Completed

2012/2013

Last Updated

30 July 2015

Hamilton Central

Option Selection Reports completed

In progress

2015/2016

Last Updated

30 July 2015

Hampstead Heath

2 lifts to existing ticket hall and footbridge

Completed

2013/2014

Last Updated

30 July 2014

Hanborough

Step Free Access Ramp to enhance new SCPF car park enxtension scheme

Completed

2013/2014

Last Updated

30 July 2015

Harpenden

Three lifts and footbridge to all platforms. Longer platforms and new ticket gates. 

Completed

2012/2013

Last Updated

30 July 2015

Haslemere

Footbridge and 2 lifts, associated platform works

Completed

May 2008

Last Updated

30 July 2015

Hassocks

Two lifts to be built in the subway at the station.

Completed

2013/2014

Last Updated

30 July 2015

Hatfield

Two lifts to be built onto footbridge at the station.

Completed

2013/2014

Last Updated

30 July 2015

Havant

2 lifts installed to an existing bridge and associated platform work

Completed

2009/2010

Last Updated

30 July 2015

Hazel Grove

2 lifts installed to an existing bridge and associated platform work

Completed

May 2008

Last Updated

30 July 2015

Headlingley

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Hebden Bridge

Provision of accessible route

Future planned

2016/2017

Last Updated

4 August 2015

Hemel Hempstead

Three lifts available for use in the subway at the station.

Completed

2014/2015

Last Updated

30 July 2015

Henley-in-Arden

Two lifts to be built onto footbridge at the station.

Completed

2014/2015

Last Updated

30 July 2015

Hereford

Two lifts and a new footbridge.

Completed

2014/2015

Last Updated

30 July 2015

Herne Hill

2 lifts from a subway to platform level

Completed

July 2008

Last Updated

30 July 2015

Highbury & Islington (GN & City Line)

One lift available for public use at the station.

Completed

2010/2011

Last Updated

30 July 2015

Hitchin

Two lifts available for public use in the subway at the station.

Completed

2013/2014

Last Updated

30 July 2015

Hither Green

Option selection reports completed.

Future planned

2017/2018

Last Updated

30 July 2015

Honor Oak Park

Two lifts added to footbridge at the station.

Completed

2014/2015

Last Updated

30 July 2015

Hooton

Three lifts and footbridge to all platforms.

Completed

2010/2011

Last Updated

30 July 2015

Horley

3 lifts installed to an existing bridge and associated platform work

Completed

2010/2011

Last Updated

30 July 2015

Huddersfield

2 glass lifts from a subway to platform level, new flight of stairs to platform 1 and demolition of toilet block

Completed

August 2010

Last Updated

30 July 2015

Huntingdon

Footbridge with two lifts and stairs to all platforms.

Completed

2012/2013

Last Updated

30 July 2015

Hyndland

Three lifts and a new footbridge.

Completed

2012/2013

Last Updated

30 July 2015

I

Ilford

Tactiles & Drainage to be funded from Afa Programme.  Main scheme to be funded and delivered by Crossrail

Completed

2014/2015

Last Updated

30 July 2015

Ipswich

Two lifts attached to footbridge.

Completed

2011/2012

Last Updated

30 July 2015

K

Keighley

Minor works (Tactiles, signage etc)

Completed

2011/2012

Last Updated

30 July 2015

Kensal Rise

1 lift (eastbound platform)

Completed

2014/2015

Last Updated

30 July 2015

Keynsham

Ramp from overbridge

Completed

2014/2015

Last Updated

30 July 2015

Kidderminster

Installation of a new, fully enclosed single span steel footbridge to the south end of the station buildings. Installation of lifts to allow access between platforms 1 and 2.

Completed

July 2008

Last Updated

30 July 2015

Kidsgrove

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Kilmarnock

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Kilwinning

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Kingston

2 lifts to and from a subway, associated platform works

Completed

June 2008

Last Updated

30 July 2015

Kirkcaldy

2 lifts to and from a subway, associated platform works

Completed

January 2009

Last Updated

30 July 2015

L

Laindon

Two lifts and footbridge for public use at the station.

Completed

2012/2013

Last Updated

30 July 2015

Leighton Buzzard

Second footbridge with three lifts and stairs at the station.

Completed

2014/2015

Last Updated

30 July 2015

Leominster

Two lifts added to footbridge at the station.

Completed

2011/2012

Last Updated

30 July 2015

Letchworth Garden City

Two lifts to be built into the existing lift shafts at the station. Proposed ideas are under consideration.

Completed

2013/2014

Last Updated

30 July 2015

Lewisham

4 lifts and 2 new staircases, refurbishment of 2 stairs, total refurb of all subways, installation of new sub station and total rewire

Completed

2009/2010

Last Updated

30 July 2015

Leyland

Option selection reports completed.

Future planned

2016/2017

Last Updated

30 July 2015

Lichfield Trent Valley

Provision of two new lifts

Future planned

2016/2017

Last Updated

4 August 2015

Limehouse

One lift up to platform at the station.

Completed

2013/2014

Last Updated

30 July 2015

Linlithgow

One lift from subway to station platform.

Completed

2012/2013

Last Updated

30 July 2015

Littleborough

Two ramps to platforms at station.

Completed

2012/2013

Last Updated

30 July 2015

Liverpool Central

1 new lift to provide step free access to the Northern line

Future planned

2016/2017

Last Updated

4 August 2015

Llandaf

New footbridge with 2 lifts

In progress

2015/2016

Last Updated

30 July 2015

Llanelli

Provision of accessible route

Future planned

2016/2017

Last Updated

4 August 2015

London Euston

2 lifts into the car park from concourse

Completed

2009/2010

Last Updated

30 July 2015

Long Eaton

Two lifts to platforms at the station.

Completed

2012/2013

Last Updated

30 July 2015

Loughborough

Two lifts added to footbridge and platform improvements.

Completed

2011/2012

Last Updated

30 July 2015

Luton

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

M

Machynlleth

New footbridge with 2 lifts

In progress

2015/2016

Last Updated

30 July 2015

Manchester Oxford Road

Two lifts to and from subway at station.

Completed

2013/2014

Last Updated

30 July 2015

Manchester Victoria

One lift to be built for public use at the station and other accessible improvements.

Completed

2013/2014

Last Updated

30 July 2015

Manningtree

Step Free Access

Future planned

2017/2018

Last Updated

4 August 2015

Market Harborough

Option selection reports completed.

Future planned

2017/2018

Last Updated

30 July 2015

Marple

Two lifts and footbridge access to all platforms.

Completed

2012/2013

Last Updated

30 July 2015

Meols

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Metrocentre (Gateshead)

Proposed idea for two lifts added to footbridge at the station.

Completed

2013/2014

Last Updated

30 July 2015

Middlesborough

Two lifts to and from the subway and platform improvements.

Completed

2010/2011

Last Updated

30 July 2015

Milliken Park

Step-free access

Completed

2013/2014

Last Updated

30 July 2015

Mills Hill

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Montrose

Two lifts and footbridge at the station.

Completed

2012/2013

Last Updated

30 July 2015

Morpeth

Two lifts to the subway.

Completed

2012/2013

Last Updated

30 July 2015

Motherwell

One lift and footbridge at the station.

Completed

2009/2010

Last Updated

30 July 2015

Mount Florida

1 lift and extended deck

Completed

September 2008

Last Updated

30 July 2015

N

Neath

Small improvement to stairs and ticket gate area at the station.

Completed

2013/2014

Last Updated

30 July 2015

New Cross

Two lifts and footbridge to platforms at the station.

Completed

2014/2015

Last Updated

30 July 2015

New Cross Gate

Walkway with three lifts and stairs.

Completed

2014/2015

Last Updated

30 July 2015

New Eltham

Two lifts and footbridge at the station.

Completed

2014/2015

Last Updated

30 July 2015

New Malden

Lifts built into subway for platforms one and four at the station.

Completed

2013/2014

Last Updated

30 July 2015

Newton

Provision of two lifts and stairs.

Completed

2013/2014

Last Updated

30 July 2015

Northallerton

Provision of accessible route

Future planned

2016/2017

Last Updated

4 August 2015

Northfield

A new lift constructed from platform 1 down to the subway.

Completed

2012/2013

Last Updated

30 July 2015

O

Orpington

3 lifts and new bridge and significant platform repairs and refurbishment, part station rewire

Completed

May 2008

Last Updated

30 July 2015

Orrell Park

Two lifts and footbridge at the station.

Completed

2013/2014

Last Updated

30 July 2015

Oxted

Single lift and power upgrades with waiting room reconstruction and associated platform works

Completed

February 2009

Last Updated

30 July 2015

P

Paddington

Toilets - Changing Places, accessible and step free "standard"

Completed

2012/2013

Last Updated

30 July 2015

Paddock Wood

Add 2 lifts to proposed replacement footbridge

Completed

2014/2015

Last Updated

30 July 2015

Palmers Green

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Peckham Rye

Option selection report completed.

Future planned

2017/2018

Last Updated

30 July 2015

Penrith

Two new lifts and a new footbridge

Future planned

2016/2017

Last Updated

30 July 2015

Perth

Three lifts added to footbridge at the station.

Completed

2012/2013

Last Updated

30 July 2015

Peterborough

Three lifts, platform tactiles, CCTV and lighting at the station.

Completed

2013/2014

Last Updated

30 July 2015

Petts Wood

Provision of accessible route

Future planned

2017/2018

Last Updated

30 July 2015

Pitsea

Footbridge with three lifts to provide step free access to platforms from the entrance.

Completed

2011/2012

Last Updated

30 July 2015

Plumstead

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Prestatyn

One lift, footbridge and ramps to all platforms at station.

Completed

2011/2012

Last Updated

30 July 2015

Preston Park

Option selection report completed.

None

2014/2015

Last Updated

30 July 2015

Purley

4 lifts and new substation, lifts into subway, significant station refurbishment

Completed

July 2008

Last Updated

30 July 2015

Putney

Three lifts to platforms and platform upgrades at the station.

Completed

2014/2015

Last Updated

30 July 2015

Q

Queens Park

Step Free Access

Future planned

2017/2018

Last Updated

4 August 2015

Queens Road Peckham

1 lift to island platform

Completed

2013/2014

Last Updated

30 July 2015

R

Radyr

New footbridge and 3 lifts

In progress

2015/2016

Last Updated

30 July 2015

Redhill

1 lift from booking hall to existing subway, adjustable ticket counter

Completed

2014/2015

Last Updated

30 July 2015

Richmond

Improve access to existing lifts

Completed

2012/2013

Last Updated

30 July 2015

Rosyth

Provision of ramps.

Completed

2013/2014

Last Updated

30 July 2015

Rotherham Central

Two lifts for public use at the station.

Completed

2011/2012

Last Updated

30 July 2015

Rutherglen

1 lift, new ticket office, foyer renewal and power upgrade

Completed

March 2009

Last Updated

30 July 2015

S

Sandhills

Single lift and ramp works during major enhancement project

Completed

January 2009

Last Updated

30 July 2015

Scunthorpe

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Selhurst

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Selly Oak

Two lifts added to the existing footbridge at station.

Completed

2012/2013

Last Updated

30 July 2015

Seven Sisters

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Severn Tunnel Junction

Three ramps and bridge across the platforms at the station.

Future planned

2015/2016

Last Updated

30 July 2015

Shipley

Four lifts attached to new footbridge and old footbridge refurbished.

Completed

2009/2010

Last Updated

30 July 2015

Shirley

Installation of a footbridge, stairs and 2 lifts. Creation of an access ramp from the existing disable car parking spaces.

Completed

2014/2015

Last Updated

30 July 2015

Shortlands

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Shotts

Two ramps to footbridge.

Completed

2013/2014

Last Updated

30 July 2015

Sittingbourne

Two lifts and platform upgrade improvements.

Completed

2011/2012

Last Updated

30 July 2015

Sleaford

 2 large ramps additional handrails/gate and CCTV.

Completed

May 2008

Last Updated

30 July 2015

Slough

Three lifts and footbridge across three platforms at the station.

Completed

2012/2013

Last Updated

30 July 2015

South Tottenham

Lifts to 2 platforms

Completed

2014/2015

Last Updated

30 July 2015

Southampton Airport Parkway

Delivered by SWT, combined with BAA scheme to deliver glass bridge and 2 lifts

Completed

2009/2010

Last Updated

30 July 2015

Southend East

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

St Austell

New footbridge with 2 lifts, waiting room,station entrance steps refurb

Completed

2014/2015

Last Updated

30 July 2015

St Erth

Two lifts and a new footbridge.

Future planned

2014/2015

Last Updated

30 July 2015

St Mary Cray

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

St Neots

Footbridge and 5 lifts

Completed

2013/2014

Last Updated

30 July 2015

Staines

Two lifts added to footbridge.

Completed

2011/2012

Last Updated

30 July 2015

Stalybridge

One lift in the subway at the station.

Completed

2014/2015

Last Updated

30 July 2015

Staplehurst

Footbridge and 2 lifts, associated platform works

Completed

2009/2010

Last Updated

30 July 2015

Stechford

Option Selection Report to assess the viability of providing step-free access between Platforms 1 and 2

Future planned

2019/2020

Last Updated

4 August 2015

Stevenage

Replace 2 goods lifts with passenger lifts

Completed

2013/2014

Last Updated

30 July 2015

Stratford HL

Ramped access between DLR, LUL and NXEA (Crossrail)

Completed

2014/2015

Last Updated

30 July 2015

Stratford-Upon-Avon

New footbridge and 2 lifts

Completed

2014/2015

Last Updated

30 July 2015

Streatham

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Streatham Common

Two lifts added to footbridge.

Completed

2009/2010

Last Updated

30 July 2015

Streatham Hill

 2 bridges and 2 lifts, significant engineering and stabilisation work, platform works

Completed

2009/2010

Last Updated

30 July 2015

Strood

Two lifts added to new bridge, short ramp and extended platforms at the station.

Completed

2014/2015

Last Updated

30 July 2015

Sutton Coldfield

Two lifts added to footbridge and refurbished canopies/shelters.

 

Station improvements opened by Rt Hon Andrew Mitchell MP.

Completed

2011/2012

Last Updated

30 July 2015

Swanley

Two lifts and refurbished footbridge.

Completed

2012/2013

Last Updated

30 July 2015

Swindon

Adapt existing goods lift for passenger use 

Completed

2013/2014

Last Updated

30 July 2015

T

Taffs Wells

New footbridge and 2 lifts

Future planned

2019/2020

Last Updated

4 August 2015

Taunton

1 lift and total platform refurbishment and major subway repairs and renewals

Completed

July 2007

Last Updated

30 July 2015

Teddington

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Theale

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Thornton Heath

Three lifts added to footbridge and platform improvements.

Completed

2013/2014

Last Updated

30 July 2015

Three Bridges

3 lifts from subway; major refurbishment to front of house and total station rewire, combined with renewals

Completed

2009/2010

Last Updated

30 July 2015

Tilbury Town

Two lifts added to footbridge at the station. Also, new ramp to ticket office.

Completed

2012/2013

Last Updated

30 July 2015

Torquay

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Totnes

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Tottenham Hale

Provision of step free access between two platforms (bridge with lifts). TfL are funding stairs/escalators

Future planned

2017/2018

Last Updated

4 August 2015

Trefforest

Option selection reports completed.

Future planned

2016/2017

Last Updated

30 July 2015

Trefforest

Option Selection Reports to end of GRIP Stage 3

Future planned

2016/2017

Last Updated

4 August 2015

Treherbert

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Tring

Step Free Access

Future planned

2019/2020

Last Updated

4 August 2015

Twyford

3 lifts and a new bridge, significant platform works and associated power upgrade

Completed

2009/2010

Last Updated

30 July 2015

V

Vauxhall

Four lifts in the subway at the station.

Completed

2012/2013

Last Updated

30 July 2015

Virginia Water

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

W

Wakefield Westgate

2 lifts into existing subway

Completed

2013/2014

Last Updated

30 July 2015

Walton on Thames

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Warwick

Option Selection Report to assess the viability of providing step-free access between Platforms 1 and 2

Future planned

2018/2019

Last Updated

4 August 2015

Waterloo (Merseyside)

1 lift.

Completed

2011/2012

Last Updated

30 July 2015

Wellingborough

Two lifts and footbridge at the station.

Completed

2011/2012

Last Updated

30 July 2015

Wembley Central

Two lifts and stair lift to platform five at the station.

Completed

2011/2012

Last Updated

30 July 2015

Wendover

Footbridge and 2 lifts

Completed

2012/2013

Last Updated

30 July 2015

West Byfleet

2 lifts and bridge, ramp to front and major platform resurfacing 

Completed

March 2009

Last Updated

30 July 2015

West Hampstead

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Westbury (Wilts)

2 lifts into a subway and an additional ramp; associated platform works

Completed

July 2007

Last Updated

30 July 2015

Westerton

Future planned

2019/2020

Last Updated

4 August 2015

Weston Super Mare

Step Free Access

Future planned

2017/2018

Last Updated

4 August 2015

Weybridge

2 lifts to an existing bridge plus significant additional station works

Completed

July 2007

Last Updated

30 July 2015

Whitton

Provision of accessible route

Future planned

2017/2018

Last Updated

4 August 2015

Winchester

Lifts to footbridge

Completed

2013/2014

Last Updated

30 July 2015

Wokingham

Add 2 Lifts to existing footbridge

Completed

2013/2014

Last Updated

30 July 2015

Worcester Park

New bridge and two lifts at the station.

Completed

2013/2014

Last Updated

30 July 2015

Worcester Shrub Hill

Likely to be two lifts added to bridge at station. Discussions are on-going for the design.

Future planned

2015/2016

Last Updated

30 July 2015

Wrexham General

One lift and footbridge at the station.

Completed

2011/2012

Last Updated

30 July 2015

Y

Ystrad Mynach

New footbridge with 2 lifts

Completed

2014/2015

Last Updated

30 July 2015