Schemes Authorised to Completion

Strategic Route No.Territory Scheme name Auth to GRIP Stage Standalone enhancement or undertaken with a planned renewal
1 SE Beckenham Junction platform extension Completed Standalone
1 SE Northern Entrance to West Malling Station Completed Standalone
1 SE Deptford Station regeneration 8 Standalone
1 SE Greenhithe Station modular station development 8 Standalone
1 SE Tunbridge Wells turnback 8 Standalone
2 SE Streatham Common - Eardley Road new entrance Completed Standalone
2 SE Sutton VC193 shunt signal walkway Completed Standalone
SE Mitcham Eastfields modular station development Completed Standalone
2 SE Sussex motorised switches 8 Standalone
3 SE Farncombe extension of up platform Completed Standalone
3 SE Portsmouth & Southsea Platform 4 extension Completed Standalone
3 SE Woking Hurdles electrification Completed Standalone
3 SE Wokingham turnback facility 8 Standalone
3 SE Basingstoke resignalling: Two to three aspect signalling change and passive provision for freight Completed Renewal
4 SE Salisbury East carriage holding sidings Completed Standalone
5 LNE Shepreth Branch booster transformer enhancement 8 Standalone
6 SE Grays Bay platform extension 8 Standalone
7 SE Great Eastern rectifier replacement (for regenerative braking) Completed Standalone
7 SE Norwich Royal Dock electrification 8 Standalone
7 SE One CD Indicators Completed Standalone
7 SE Marks Tey to Colchester: Improve maintenance access 8 Renewal
8 LNE Un-interrupted power supply at Belford Completed Standalone
8 LNE Peterborough to Werrington bi-directional signalling Completed Standalone
8 LNE Darlington South Junction overlap constraint reduced Completed Standalone
8 LNE Grantham banner repeater 8 Standalone
8 LNE Thirsk platform extension 8 Standalone
8 LNE Wood Green feeder station enhancement 8 Standalone
10 LNE Hull Docks Branch capacity improvement 8 Standalone
10 LNE Calder Valley platform extensions 8 Standalone
10 LNE Platform extensions at Crossgates & Garforth 8 Standalone
10 LNE Selby Station Platform 3 extensions 8 Standalone
10 LNE Healey Mills line speed Increase 8 Renewal
10 LNE Bradford Mill Lane switch and crossing remodelling 8 Renewal
11 LNE LNE Brigg Line enhancement 8 Standalone
11 LNE Wrawby Junction switch and crossing line speed increase 8 Renewal
12 LNW Route section line speed schemes 8 Standalone
12 W Taunton relief line speed increase 8 Standalone
12 W Penwithers Junction enhancement 8 Renewal
13 W Bristol Parkway additional platform Completed Standalone
13 W Heathrow Airport Junction enhancement Completed Standalone
13 W Clifton Down turnback 8 Standalone
13 W Paddington to Reading relief linespeed upgrade 8 Standalone
13 W Newport Station regeneration 8 Standalone
13 W Bristol Parkway additional 4th platform 8 Standalone
13 W Westerleigh Junction, Barnt Green Line linespeed improvements 8 Renewal
13 W Pilning down and up goods loop Increased entry and exit speeds and passengerisation 8 Renewal
17 LNW Camphill removal of permanent speed restriction Completed Standalone
17 LNW Grand Junction removal of permanent speed restriction Completed Standalone
17 LNW Tame Bridge and Perry Barr permanent speed restriction removal 8 Standalone
17 LNW Tile Hill Station enhancement 8 Standalone
17 LNW Berkswell Station enhancement 8 Standalone
17 LNW Birmingham - Cross city line speed improvements 8 Standalone
17 LNW Sutton Park W10 gauge enhancement 8 Standalone
17 LNW Coventry - Leamington part doubling Completed Renewal
17 LNW Tyseley North Junction enhancement 8 Renewal
17 W Fearnhill Heath - New intermediate signals on up and down lines 8 Renewal
18 LNW Euston Station concourse interim improvements 8 Standalone
18 LNW Northampton Station platform lengthening 8 Standalone
18 SE Colwich 21 Points 8 Renewal
19 LNE Corby track and signalling enhancment 8 Standalone
19 LNE North Erewash - Chesterfield bi-directional signalling 8 Renewal
19 LNE East Midlands Resignalling - Trent East Junction redoubling 8 Renewal
20 LNW Manchester Airport third platform 8 Standalone
20 LNW Olive Mount Chord enhancement 8 Standalone
20 LNW Seaforth gauge clearance 8 Standalone
20 LNW Rainhill 4 aspect signalling Completed Renewal
20 LNW Guide Bridge West Junction - higher speeds across the junction 8 Renewal
21 LNW Southport Station improvements 8 Renewal
23 LNW Daisyfield - Hellifield capacity improvements 8 Standalone
23 LNW S&C enhancement schemes 8 Renewal
24 SC Forth Bridge operational enhancements - Phase 1 Completed Standalone
24 SC Inverkeithing EV407 banner repeater enhancement 8 Standalone
24 SC Edinburgh Waverley 3rd Integrated Electronic Control Centre 8 Standalone
24 SC Grangemouth Junction switch and crossing enhancement Completed Renewal
24 SC Easement of permanent speed restrictions in Fife 8 Renewal
24 SC Montrose switch and crossing renewals 8 Renewal
24 SC Larbert North/Plean signalling upgrade 8 Renewal
24 SC Bathgate Branch plain line renewal and linespeed increase 8 Renewal
24 SC Newbridge and Hilton switch and crossing renewal 8 Renewal
26 SC Ayrshire coal routes: Re-location of PA335 signal 8 Standalone
26 SC Hunterston additional signal 8 Standalone
26 SC Polmadie Depot operational enhancements Completed Renewal
26 SC Temporary maintenance facility at Ayr Completed Renewal
26 SC Shields Junction - Burma Road electrification Completed Renewal
26 SC Glasgow Central Station re-Interlocking enhancement 8 Renewal
Multi

Cross Route

TPWS optimisation works (Buffer stops) 8 Standalone
Multi Cross W10 Ipswich to Yorkshire terminals 8 Standalone
Multi SE Substation security enhancements 8 Standalone
Multi SE Static loadbank (Direct current regenerative braking) 8 Standalone
Multi SE Cross London gauge and capacity 8 Standalone
Multi W Collision protection beams - Scheme 1 8 Standalone
Multi W Wheel flange Lubricators 8 Standalone
Multi SE HV Feeder renewals 8 Renewal

Key:

GRIP stage : Describes how Network Rail manages and controls projects that enhance or renew the national rail network.  It covers the project process from inception through to the post implementation realisation of benefits.

Standalone enhancement : An enhancement undertaken as a separate scheme independent of any planned renewal.

Enhancement undertaken with a renewal : An enhancement implemented as part of a planned renewal.