• Contact us
  • About us
  • News
  • Publications
  • Press
Network Rail Home
  • Home
     
  • Passengers

    Our stations

    • Birmingham New Street
    • Cannon Street
    • Charing Cross
    • Edinburgh Waverley
    • Euston
    • Fenchurch Street
    • Glasgow Central
    • King's Cross
    • Leeds
    • Liverpool Lime Street
    • Liverpool Street
    • London Bridge
    • Manchester Piccadilly
    • Paddington
    • St Pancras International
    • Victoria
    • Waterloo
    •  
    • Disabled people's access policy

    Improvements

    • Railway & Track
    • Stations
    • High speed rail
    • Railway Communications System
    • Electrification
    • ERTMS
    • On-train metering

    Safety

    • Level Crossings

    Timetables and travel

    • Engineering works
    • Find a train operator
    • Journey planners
    • Ticket refunds
    • Train ticket information
    • Tickets and running times
    • Railway links
    • Keeping Scotland moving
     
  • Improvements

    Railway & Track

    • A-C
    • D-F
    • G -I
    • K-L
    • M-O
    • P-R
    • S-Z

    ERTMS

      Stations

      • A-C
      • D-F
      • G-I
      • J-L
      • M-O
      • P-R
      • S-Z

      On-train metering

        High speed rail

        • New Lines Programme
        • CGI concept animation

        Railway Communications System

        • Timeline
        • Settle and Carlisle

        Electrification

        • North West electrification
         
      • Railway & Track

        A-C

        • Airdrie-Bathgate
        • Anglia
        • Borough viaduct
        • CrossRail

        P-R

        • Paisley corridor improvements
        • Reading
        • Redditch

        D-F

        • Edinburgh – Glasgow (EGIP)
        • Felixstowe – Nuneaton

        S-Z

        • Stafford – Norton Bridge
        • Southampton to Nuneaton freight upgrade
        • South Wales resignalling
        • Thameslink

        G -I

        • Gogar rail interchange
        • Hitchin Fly-over
        • The Great Western

        K-L

        • London Bridge
        • Investing in London
        • London 2012
        • London Overground

        M-O

        • North Cotswolds
        • North Doncaster chord
        • North London Line
        • Northern Hub
        • Nuneaton North
         
      • S-Z

        Stafford – Norton Bridge

        • Community consultation
        • Timeline
        • What's happening

        Southampton to Nuneaton freight upgrade

          South Wales resignalling

            Thameslink

            • What's happening
             
          • Stafford – Norton Bridge
             
            • Community consultation
            • Timeline
            • What's happening
            • Community consultation

            • As part of our application to the Infrastructure Planning Commission, we are in the process of carrying out a full consultation with the local community, landowners and other statutory consultees that might be impacted by the scheme.

              Phase 1

              In October 2010 we carried out a series of events asking for feedback from the public, technical and environmental bodies and our partners in the rail industry on 3 options to improve the railway around Stafford/Norton Bridge.

              After extensive analysis of the benefits and impacts of each option a preferred alignment was selected for further development.

              • Option selection report - non technical summary (PDF 300 KB)

              Phase 1 Consultation Documents:

              • Stafford Area Improvements Norton Bridge Railway Junction - Section 42 Consultation Pack (PDF  18.9 MB)
              • Proposal maps (PDF 140 KB)
              • Construction Compound and Access Proposals Report (PDF 15.5 MB)
              • Preliminary Environmental Report - Non Technical Summary (PDF 1.4 MB)
              • Preliminary Environmental Report (PDF 13.5 MB)

              Phase 2

              In October and November 2011 we carried out a second round of public consultation giving details of the preffered option. We are currently looking at all comments and suggestions and are working up our proposal to a greater level of detail ahead of a further round of consultation in late Spring 2012.

              Phase 2 consultation documents

              • Stafford Area Improvements Norton Bridge Railway Junction - Section 42 Consultation Pack - Phase 2 (PDF 22.2 MB)
              • Construction fact sheet (PDF 181 KB)
              • Highways and footpaths fact sheet (PDF 815 KB)
              • Environment fact sheet (PDF 81 KB)
              • Phase 2 consultation feedback form (PDF 6 MB)

              Ahead of the public consultation, we talked to Staffordshire County Council and Staffordshire Borough Council l who helped us draw up a plan for how we should consult the community. This document is called the Statement of Community Consultation and is available to download.

              • Statement of Community Consultation (PDF 2.81 MB)
              • Second Statement of Community Consultation (PDF 2.6 MB)

              If you have any further questions or comments on the proposals you can:

              • email them to staffordconsultation@networkrail.co.uk; or
              • contact our helpline on 08457 11 41 41.
            • © Network Rail
            • Contact us
            • Site map
            • Terms and conditions
            • Privacy policy
            • Links
            • Accessibility