Box Tunnel, Box, Wiltshire

Archive/Image Reference

-


Title of Original Drawing

-


Author

Name goes here


Description of Drawing

-


Date of Creation

00/00/0000


Scale of Original Drawing

-

 
 
  • Image 1 of 6
    Box Tunnel - Sections
    Box Tunnel...
  • Image 2 of 6
    Cross section tunnel number 1
    Box Tunnel...
  • Image 3 of 6
    Box Tunnel East (Portal)
    Box Tunnel...
  • Image 4 of 6
    Key Stone Elevations Number 3
    Box Tunnel...
  • Image 5 of 6
    Construction of section shafts
    Box Tunnel...
  • Image 6 of 6
    West Front plan of foundations and elevations
    Box Tunnel...
Box Tunnel - Cross Section Tunnel Number 1
Box Tunnel - Cross Section Tunnel Number 1

Did you know?

Legend has it that the rising sun shines through Box Tunnel on Brunel’s birthday, 9 April. Recent research has shown that unfortunately this is not the case, although the sun does shine directly through the tunnel on several other days throughout April and again in September.

At the time of opening, Brunel’s Box Tunnel was the longest railway tunnel ever built. Controversial from the start, its problematic construction delayed the completion of the Great Western Railway’s London to Bristol route until June 1841. Today it is one of Isambard Kingdom Brunel’s most celebrated structures. 

Originally proposed in the Great Western Railway Act of 1835, building a tunnel through Box Hill was an impossible and dangerous engineering project according to its critics. Box Tunnel, located between Chippenham and Bath, was by far the most difficult single engineering work on the entire London to Bristol route as it contained the unusually steep gradient, by Brunel’s standards, of 1 in 100 over its length.

 

Bath Stone

Between 1836 and 1837 eight shafts were sunk at intervals through the hill and along the projected alignment to establish the nature of the underlying rock. Over the course of nearly two miles the tunnel dipped westbound through several overlying geological strata comprising of Great Oolite limestone (Bath Stone), and Inferior Oolite, Fuller’s Earth (which is particularly prominent in the Bath district) and a small amount of Lias Clay at the western end. At 9636ft (2,937m) with a 25ft (7.6m) diameter bore, contemporary reports put the total volume of material extracted from the tunnel at 247,000 cubic yards (189,000 cubic metres).

Two contractors were appointed to construct the tunnel; George Burge from Herne Bay was the major contractor, responsible for 75 per cent of the overall length of the tunnel working from the west, and Messers Lewis and Brewer, who were locally sourced contractors responsible for the remainder. Construction of the tunnel began in December 1838.

 

Railway navvies

Working conditions when building the tunnel were not good. Construction of the tunnel was divided into six isolated sections, and for much of the time access to these was only via the ventilation shafts, made 25ft (7.6m) in diameter, which ranged in depth from 70 to 300ft (21.3 to 91.5m). Blasting, which consumed 1 ton of explosives per week, took place within these chambers and with the workmen present. The only illumination was by means of candles, of which 1 ton weight was also consumed every week. During the early construction of the tunnel, workmen often had to evacuate as quickly as they could, as water gushed in from the Great Oolite strata. Pumping facilities had to be increased to deal with the considerable inflow.

 

The final piece

The overdue completion of Box Tunnel was delaying the opening of the whole line from London to Bristol as by August 1839 only 40 per cent of the tunnel had been constructed. By the summer of 1840 the Paddington to Faringdon Road (just east of Swindon) and Bath to Bristol sections of line had been completed. In January 1841, therefore, Brunel cajoled his major contractor to increase his workforce from twelve hundred to four thousand men, and by means of their superhuman effort the tunnel was effectively completed in April 1841. Work on the tunnel had begun from both the east and west sides of Box Hill in 1836; Brunel’s calculations, and the skills of the contractors and navvies were such that when the two ends met in 1841 the difference in their alignment was less than 2 inches (5cm). Brunel designed a grand classical portal for the west end of the tunnel but the east portal is less flamboyant with simple stonework. It opened to through London - Bristol traffic on 30 June 1841, without ceremony. 

Page first created: Tuesday, January 17, 2012
Page last updated: Friday, April 20, 2012

1835

31 August: The Great Western Railway was authorised by an Act of Parliament to build the railway line between the cities of London and Bristol.

 

1838

George Burge of Herne Bay, Thomas Lewis of Bath and William Brewer of Box are contracted to build the tunnel.

 

1836

Work on Box Tunnel begins.

 

1841

April: Box Tunnel completed.

 

1841

30 June: Box Tunnel opened, and through services between London and Bristol commence.

 

1861

The line from London to Bristol is converted to mixed gauge track.

 

1892

20 May: the last of the GWR broad gauge tracks are lifted.

 

1986

Restoration of the tunnel was undertaken. A viewing platform on London Road (A4, Bath) was opened to give visitors the best view of the western portal.

 

2009

The electrification of London (Paddington) – Bristol - Swansea announced by Network Rail.

 

2010

March: Network Rail clears overgrown plants and foliage growing along the embankment around the tunnel’s west portal to improve the vista from the viewing platform 0n London Road.

 
Façade of Bristol Temple Meads Joint Station

Bristol Temple Meads Station | Stations

Built as the western terminus of the Great Western Railway’s main line from London to Bristol, Bristol Temple Meads station has undergone many changes as it outgrew Brunel’s original building and became the railway gateway to the West Country. 
Read more

 

Widening of Line Maidenhead to Didcot - Maidenhead Bridge Sections and Plans

Maidenhead Bridge | Bridges and Viaducts

At the time it was built, Isambard Kingdom Brunel’s railway bridge over the River Thames at Maidenhead boasted the flattest yet widest brick constructed arches in the world. 
Read more

 

Details of end screen at Paddington Station

Paddington Station, London | Stations

Paddington Station is the grand terminus for the Great Western Railway that Isambard Kingdom Brunel always intended. Its story reflects that of the railway throughout the 19th, 20th and into the 21st century.
Read more

 

Great Western Railway crest

Great Western Railway | Companies

The Great Western Railway built the main line which still operates today between London and Bristol. In appointing Isambard Kingdom Brunel as its chief engineer, together they pushed the boundaries of railway engineering which can still be seen in today’s infrastructure.
Read more

 

Signature of IK Brunel, 1852

Isambard Kingdom Brunel  (1806 - 1859) | People

Isambard Kingdom Brunel is celebrated as an engineering genius. Brunel’s Great Western Railway was designed for speed and efficiency, and his daring schemes and record breaking structures are still a vital part of today’s railway infrastructure. He combined considerable ingenuity with immense boldness of vision in his sometimes controversial achievements.
Read more

 
 
 
 
Comments & Suggestions (2)

Your comments and suggestions are welcomed. Please note that all submissions will be reviewed and will be dealt with in accordance with our terms and conditions of website use. We reserve the right not to publish any comments or suggestions. Your [user name] will be displayed as provided and all personal information will be dealt with in accordance with the terms of our privacy policy. Please ensure that you have read our terms and conditions of website use and our privacy policy in full prior to submitting any comments or suggestions.

 

 It should be identified that Brunels tunnel actually runs from Corsham at the west end to Box at the east end. Passing through the major part of the Oolite Limestone, named as Bath Stone but more locally know as Corsham Stone. Some fifty plus stone quarries/mines existed in the Corsham area to extract the stone.

Posted by Ken, Saturday, July 14, 2012.


Hi The timeline for the Box Tunnel must be incorrect as you have the tunnel being built in 1836, two years before the contract is awarded for the construction. 

Posted by Richard, Tuesday, February 28, 2012.


Add a comment

Name

 
Please enter your name

Email

 
Please enter a valid email address

Your comment (500 character limit)  

Please enter your comment


 

See also

Widening of Line Maidenhead to Didcot - Maidenhead Bridge Sections and Plans

Maidenhead Bridge

At the time it was built, Isambard Kingdom Brunel’s railway bridge over the River Thames at Maidenhead boasted the flattest yet widest brick constructed arches in the world.   Read more